ZA HUNG HYDROPOWER PLANT
- Total investment: 505 billions VND
- Location: Za Hung communes – Dong Giang District – Quang Nam Province
- Capacity: 30MW
- Completed: July 2009
PROJECT SPECIFICATION
Power (P): 30MW (2x15MW)
Average output (E0): 122,7 million kwh/year
Basin: 537 km2
Normal rising water level: 450 m
Dead rising water level: 445 m
Average water flow per year: (Q0): 34,1 m3/s
The maximum water flow through the plant: 53,39 m3/s
Gross : 1,120,000 m3
Highest water colume: 84,8 m
Tunnel: size 6×6 m, length 1,4 km
Voltage connector 110KV, single circuit line AC 185 with length 27 km to Za Hung – Thach My